PRE - LUNCH
Last day of week 2 and time is flying. I feel like we are doing kind of good. It's really hard to tell with this being the first project and all. It's been a switch in priority with the programming a little bit. Nothing that ruins everything but still it's not as we first thought it would be. However, the things that are present at the moment are still elements that would be needed to be implemented later on anyways. Maybe this is even better, it's impossible for us to now really.
But we have most of the thing we need for our proof of concept. It all really comes down to Chris at this point. We need a full game loop according to Alex at our Forum time yesterday. Forum is a 1 hour chat between all the designers where we usually talk about everything game related but now we don't have any seconds years anymore and we are in the middle of our projects so naturally we talk about that. How things are going and if there are any problems or disputes between us in the team.
I feel like our team is doing fine. It would be nice with a second programmer to really get things going and maybe implement some cool stuff for the finished product. It will be a game in the end but with the power of a second programmer it really could help things to be pushed a bit further and have it really cool looking with some more features.
As long as Chris fixes the tower projectiles and health system today we have a game loop and that what really counts for the proof of concept. First I thought that could get by with only having a tower that shot an enemy that walks the intended path. And that the enemy dying or the player losing didn't really matter. However during the forum I found out that we really need a playable loop for it to count. But that is hopefully not that hard to implement.
AFTER LUNCH
After lunch we had our fika hour of memes and after that we made some fixes to our Trello board. There were a bunch of stuff that was not finished in the programming section due to Chris making other things instead of what was on the board. But it was probably necessary for us to have those stuff beforehand.
Other then that I updated Hansoft to more up to date. I missed some stuff from Trello on the "on going" things.

Comments